Chapter 7 · Water, energy and resilience

Chapter 7 · Part I · The plan

Water, energy and resilience

3D view of Bedwell Bayfront Park and the streets around it in this site's housing simulator.
Bedwell Bayfront Park in 3D, from the District 1 housing simulator.Housing simulator · © OpenStreetMap, © CARTO · ODbL 1.0 · CARTO basemap terms
Figure 7.1Park irrigation controllers being replaced with smart controllers: 18 of 34
Being replaced under the January 2026 contractNot in this contract

City record: Staff Report 26-009-CC: smart irrigation controllers at 17 City sites (Jan. 27, 2026)

Irrigation, water use, energy, trees and sea level rise at park sites.

Figure 7.2Water used by each park

Not yet published Metered water use by park.

The measures

Park irrigation controllers replaced with smart controllers

5.1

Target: not yet proposed

Owner: Public Works · Updated: Quarterly

CartegraphHow measured

Water used per irrigated acre

5.2
Not yet published

Target: not yet proposed

Owner: Public Works · Updated: Yearly

CartegraphCity GISHow measured