Appendix A
The 2019 recommendations

The City’s 2019 Parks and Recreation Facilities Master Plan made 122 recommendations. Here is each one, with its status today and, where one was found, the City record behind it.
Statuses as of Nov. 15, 2026, from staff reports, capital program reports, Commission packets and the City’s own Tier 1 table. Titles are short plain-language summaries; each row links to the plan’s full wording. This plan's analysis
By priority tier
Showing 122 of 122
Plan a new Belle Haven campus: community center, senior center, youth center and pool
Belle Haven Community Campus · Capital project · $$$$: $2,000,000 or more
Overtaken by a bigger decision: the City rebuilt the site as the Community Campus, with Meta's contribution and Measure T bonds. It opened in May 2024.
2019 plan wording, p. 120 · City record, July 24, 2024 (G-1.1)
Add classroom storage
Belle Haven Child Development Center · Simple fix · $: under $100,000
Add a staff break room and another office
Belle Haven Child Development Center · Simple fix · $: under $100,000
Dedicate the multipurpose room to children and parent meetings
Belle Haven Child Development Center · Program or practice
Improve the building to serve the number of students
Belle Haven Child Development Center · Program or practice
The roof is replaced (Apr. 2026), and a contract for electrification and new heating and air filtration was awarded July 14, 2026 (CPB025).
2019 plan wording, p. 120 · City record, July 14, 2026 (p. 3)
Add a locked, alarmed evacuation gate
Belle Haven Child Development Center · Simple fix · $: under $100,000
Use the space between buildings for an outdoor staff area
Belle Haven Child Development Center · Program or practice
More signs to find the park and get around in it
Kelly Park · Simple fix · $: under $100,000
More signs on park rules, parking hours, dogs and turf
Kelly Park · Simple fix · $: under $100,000
More community events at the park
Kelly Park · Program or practice
Summer concerts (2024 on) and a Juneteenth celebration (2025) are held at the park.
2019 plan wording, p. 120 · City record, July 24, 2024 (G-2.2)
More storage for sports users
Kelly Park · Simple fix · $: under $100,000
Connect the park directly to the Senior Center
Kelly Park · Capital project · $: under $100,000
The new Campus was designed with a connection to Kelly Park. It opened in May 2024.
Improve the Highway 101 crossing and add noise reduction
Kelly Park · Capital project · $$$: $500,000 to $2,000,000
Safe, direct access from a Dumbarton Corridor trail
Kelly Park · Capital project · $$$: $500,000 to $2,000,000
In the 2020 Transportation Master Plan. SamTrans is studying the corridor; its feasibility study is due in winter 2027.
A dumpster enclosure; screen the transformers
Kelly Park · Simple fix · $: under $100,000
Native, drought-tolerant landscaping and green infrastructure
Kelly Park · Simple fix · $: under $100,000
Install a trench drain when the turf is replaced
Kelly Park · Capital project · $: under $100,000
Part of CPP020, which is designed and on hold. Whether the design includes the drain is not yet published.
2019 plan wording, p. 122 · City record, April 14, 2026 (L-2.10)
Improve acoustics, heating, cooling and ventilation
Arrillaga Family Recreation Center, Arrillaga Family Gymnasium · Simple fix · $: under $100,000
Heating and cooling work at the Recreation Center (CPB005) is in design and on hold for staffing. No acoustics work is listed.
2019 plan wording, p. 124 · City record, April 14, 2026 (L-2.6)
An addition joining the buildings with one entrance
Arrillaga Family Recreation Center, Arrillaga Family Gymnasium · Capital project · $$$$: $2,000,000 or more
Add a large fitness, weights and wellness center
Arrillaga Family Recreation Center, Arrillaga Family Gymnasium · Capital project · $$$: $500,000 to $2,000,000
Review how the center operates
Arrillaga Family Gymnastics Center · Program or practice
Study a permanent retractable dome
Burgess Pool · Capital project · $$$: $500,000 to $2,000,000
A dome study begun in 2019 is on hold. In Nov. 2024 staff found the options too costly to pursue at the time.
Turn the wading pool into a splash pad or beach entry
Burgess Pool · Capital project · $$: $100,000 to $500,000
More shade, cabanas and permanent storage
Burgess Pool · Simple fix · $: under $100,000
Keep maintaining and upgrading the pool's amenities
Burgess Pool · Simple fix · $: under $100,000
Upkeep continues through the aquatics program (CPP001). A lobby, locker room and restroom renovation (CPB023) is on hold.
2019 plan wording, p. 124 · City record, April 14, 2026 (L-2.6; L-2.9)
Study renovating the building
Menlo Children's Center · Capital project · $$: $100,000 to $500,000
Not funded. In May 2026 staff said the effort is on hold; about $724,000 in Measure T bonds had been planned for it.
2019 plan wording, p. 124 · City record, May 12, 2026 (G-2.6)
Improve and expand the outdoor areas
Menlo Children's Center · Simple fix · $: under $100,000
Upgrade the after-school building, with a reception desk
Menlo Children's Center · Simple fix · $: under $100,000
Install field lighting
Burgess Park · Capital project · $$$: $500,000 to $2,000,000
Consider artificial turf for year-round play
Burgess Park · Capital project · $$$$: $2,000,000 or more
The City lists it as not funded or started (Apr. 2025).
Reconfigure the baseball diamond for more sports
Burgess Park · Capital project · $$$: $500,000 to $2,000,000
The City lists it as not funded or started (Apr. 2025).
Consider underground water storage when fields are renovated
Burgess Park · Capital project · $$$$: $2,000,000 or more
Expand the snack shack; add shade and seating
Burgess Park · Capital project · $$$: $500,000 to $2,000,000
The City lists it as not funded or started (Apr. 2025).
Renovate the playground for nature play and all abilities
Burgess Park · Capital project · $$$: $500,000 to $2,000,000
Reopened June 1, 2024, with equipment for all abilities and rubber surfacing.
2019 plan wording, p. 126 · City record, Oct. 22, 2025 (F-3.2)
More reservable picnic and gathering areas
Burgess Park · Capital project · $$: $100,000 to $500,000
Native plants in place of small unused lawns
Burgess Park · Simple fix · $: under $100,000
Energy-efficient lighting, such as LED tennis lights
Burgess Park · Simple fix · $: under $100,000
More lighting, and maybe music, at the skate park
Burgess Park · Capital project · $$: $100,000 to $500,000
Add outdoor fitness equipment
Burgess Park · Capital project · $: under $100,000
More distinctive features, such as art
Burgess Park · Capital project · $: under $100,000
Maintain and re-line the duck pond
Burgess Park · Capital project · $$: $100,000 to $500,000
Finish the dog area and build the restroom
Willow Oaks Park · Capital project · $$$: $500,000 to $2,000,000
Finished June 29, 2024: a larger dog park and a new restroom.
2019 plan wording, p. 128 · City record, Oct. 22, 2025 (F-3.2)
Renovate the playground
Willow Oaks Park · Capital project · $$: $100,000 to $500,000
Rebuilt in the June 2024 renovation, with a focus on accessibility.
2019 plan wording, p. 128 · City record, Oct. 22, 2025 (F-3.2)
Repave and improve pathways
Willow Oaks Park · Simple fix · $: under $100,000
Paths rebuilt in the June 2024 renovation, plus a new path from Pope and Elm streets.
2019 plan wording, p. 128 · City record, Oct. 22, 2025 (F-3.2)
A curb ramp and bollards for a maintenance staging area
Willow Oaks Park · Simple fix · $: under $100,000
Consider a gathering space or community garden
Willow Oaks Park · Capital project · $$: $100,000 to $500,000
Deferred to a Phase 2 in 2022. No later decision or funding found.
2019 plan wording, p. 128 · City record, Dec. 6, 2022 (I-3.2)
Reconfigure the tennis courts
Willow Oaks Park · Capital project · $$$: $500,000 to $2,000,000
Better signs at the Gilbert Avenue entry
Willow Oaks Park · Simple fix · $: under $100,000
LED tennis court lights and better park lighting
Willow Oaks Park · Simple fix · $: under $100,000
Tennis court and park lighting upgraded in 2024. Whether the new fixtures are LED is not stated.
2019 plan wording, p. 128 · City record, Oct. 22, 2025 (F-3.2)
Better neighborhood access to the tennis courts
Willow Oaks Park · Program or practice
Done citywide: drop-in tennis became free in Feb. 2024, and courts can be reserved online.
2019 plan wording, p. 128 · City record, Feb. 27, 2024 (F-2.4)
Improve drainage across the park
Willow Oaks Park · Capital project · $$: $100,000 to $500,000
New drains and grading in the 2024 renovation. Whether it fixed runoff onto the courts is not stated.
2019 plan wording, p. 128 · City record, Oct. 22, 2025 (F-3.2)
Study a water well at the park
Willow Oaks Park · Capital project · $$$$: $2,000,000 or more
Evaluated: a well at the school field next door was found not feasible.
2019 plan wording, p. 128 · City record, April 14, 2026 (L-2.17)
Move the dog area off the sports fields
Nealon Park · Capital project · $$$: $500,000 to $2,000,000
Not funded or started. The dog area shares the fenced softball field on weekday mornings.
A native plant demonstration garden
Nealon Park · Simple fix · $: under $100,000
Bring life to the quiet southern corner: art, seating, game tables
Nealon Park · Simple fix · $: under $100,000
Upgrade pathways from asphalt to concrete
Nealon Park · Simple fix · $: under $100,000
Pathway replacement finished in 2022.
2019 plan wording, p. 130 · City record, May 9, 2023 (J-1.8)
A permanent restroom
Sharon Park · Capital project · $$: $100,000 to $500,000
Repair the pond lining; a new pump house
Sharon Park · Capital project · $$: $100,000 to $500,000
May 2026: the Council added a pond pump station replacement ($500,000, Measure T). Relining the pond is not mentioned.
2019 plan wording, p. 130 · City record, May 12, 2026 (p. 3)
Upgrade pathways, landscaping, irrigation and lighting
Sharon Park · Capital project · $$: $100,000 to $500,000
Paths rebuilt in 2021-22. Landscaping, irrigation and lighting are not funded or started.
Improve informal paths; gardens or interpretive signs
Sharon Park · Simple fix · $: under $100,000
Update and expand the playground; add bike racks
Sharon Park · Simple fix · $: under $100,000
Named in the playground program (CPP007) for an upgrade within five years. Bike racks are not mentioned.
2019 plan wording, p. 130 · City record, April 14, 2026 (L-2.9)
Consider a fenced off-leash dog area
Sharon Park · Capital project · $$: $100,000 to $500,000
Enhance natural areas; a demonstration habitat
Stanford Hills Park · Simple fix · $: under $100,000
Consider a fenced dog agility area
Stanford Hills Park · Capital project · $$: $100,000 to $500,000
Nature play or an all-ages fitness area
Stanford Hills Park · Capital project · $$$: $500,000 to $2,000,000
Add seating
Stanford Hills Park · Simple fix · $: under $100,000
Replace asphalt paths with concrete
Stanford Hills Park · Simple fix · $: under $100,000
In the pathway program's five-year plan (CPP006). No work date published.
2019 plan wording, p. 130 · City record, April 14, 2026 (L-2.9)
Keep flexible space for events and downtown use
Fremont Park · Program or practice
Flexible space for City events such as summer concerts and the holiday celebration.
2019 plan wording, p. 132 · City record, July 24, 2024 (G-2.2)
Consider a permanent restroom
Fremont Park · Capital project · $$$: $500,000 to $2,000,000
Consider a permanent stage
Fremont Park · Capital project · $$: $100,000 to $500,000
Add a play area for ages 2 to 5
Hamilton Park · Capital project · $$: $100,000 to $500,000
Covered by CPP021, on hold for staffing. Its published scope does not yet list a tot lot.
2019 plan wording, p. 132 · City record, April 14, 2026 (L-2.10)
Plant more trees for shade
Hamilton Park · Simple fix · $: under $100,000
Better rain garden plantings, with signs
Hamilton Park · Simple fix · $: under $100,000
Barbecues, a shade structure and game tables
Hamilton Park · Capital project
Some funding for outreach and scoping, through CPP021, on hold for staffing.
Keep the open lawn for informal play
Hamilton Park · Program or practice
The open lawn remains, beside the playground.
A group picnic area near the field
Jack W. Lyle Park · Capital project · $$: $100,000 to $500,000
More parent seating at the playground
Jack W. Lyle Park · Simple fix · $: under $100,000
Contain the sand play area
Jack W. Lyle Park · Simple fix · $: under $100,000
A picnic area at the lawn; study a small dog area
Jack W. Lyle Park · Capital project · $$: $100,000 to $500,000
Tell the story of Karl E. Clark and the neighborhood
Karl E. Clark Park · Program or practice
A storyboard on Karl E. Clark's life was installed in 2021, with the Menlo Park Historical Association and Belle Haven Action.
2019 plan wording, p. 134 · City record, July 20, 2021 (p. 5)
Remove a path to free up lawn
Karl E. Clark Park · Simple fix · $: under $100,000
Renovate the playground; add bike racks
Karl E. Clark Park · Capital project · $$$: $500,000 to $2,000,000
Covered by CPP021, on hold for staffing. A January 2026 City report lists it among the next three playgrounds to replace, with construction estimated for 2027 (Staff Report 26-001-CC, Att. H).
2019 plan wording, p. 134 · City record, April 14, 2026 (L-2.10)
Improve visibility into the back corners
Karl E. Clark Park · Simple fix · $: under $100,000
Community garden plots, or a picnic and gathering area
Karl E. Clark Park · Capital project · $$: $100,000 to $500,000
Some funding for outreach and scoping, through CPP021, on hold for staffing.
Bring out natural features and unique amenities
Seminary Oaks Park · Simple fix · $: under $100,000
Move picnic tables back from the street; more shaded seating
Seminary Oaks Park · Simple fix · $: under $100,000
Play equipment for 2- and 3-year-olds
Tinker Park · Simple fix · $: under $100,000
Turn parent seating away from the sun
Tinker Park · Simple fix · $: under $100,000
Striping or art on the paved fire lane
Tinker Park · Simple fix · $: under $100,000
A small demonstration garden
Tinker Park · Simple fix · $: under $100,000
Park signs so people know it is there
Alma Street Park · Simple fix · $: under $100,000
Extend the trail north along the Caltrain tracks
Alma Street Park · Capital project · $$: $100,000 to $500,000
Keep the community involved in restoration planting
Alma Street Park · Simple fix · $: under $100,000
More amenities with the Ohlone-Portola Heritage Trail
Alma Street Park · Simple fix · $: under $100,000
Follow the Bedwell Bayfront Park Master Plan
Bedwell Bayfront Park · Capital project · $$$$: $2,000,000 or more
Carried out through the entrance project (CPP003; Phase 1 construction planned for spring 2027) and landfill system repairs (CPP002).
2019 plan wording, p. 136 · City record, April 14, 2026 (L-2.9; L-2.10)
Accessible paths, benches and tables at the viewpoints
Sharon Hills Park · Simple fix · $: under $100,000
Reservable picnic sites
Sharon Hills Park · Simple fix · $: under $100,000
A nature trail with habitat information
Sharon Hills Park · Capital project · $$: $100,000 to $500,000
Crosswalks where trails cross roads
Sharon Hills Park · Simple fix · $: under $100,000
Replace declining trees
Marsh and Bay Park · Simple fix · $: under $100,000
Consider a demonstration garden
Marsh and Bay Park · Simple fix · $: under $100,000
Add public art
Marsh and Bay Park · Capital project · $$: $100,000 to $500,000
Keep updating benches, fountains and other furnishings
Citywide: all parks · Citywide guideline
29 drinking fountains got bottle fillers (2021), and the 2024 renovations added benches and tables.
2019 plan wording, p. 138 · City record, May 25, 2021 (O-2.76)
Storyboards on history, nature and culture
Citywide: all parks · Citywide guideline
Storyboards at Karl E. Clark Park (2021) and at Fremont Park, on Camp Fremont.
2019 plan wording, p. 138 · City record, July 20, 2021 (p. 5)
Rubber surfacing, not wood chips, when play areas are updated
Citywide: all parks · Citywide guideline
The 2024 Willow Oaks and Burgess playgrounds used rubber surfacing.
2019 plan wording, p. 138 · City record, July 11, 2023 (K-3.2)
Dog bags and water wherever dogs are allowed
Citywide: all parks · Citywide guideline
Both fenced dog parks, at Willow Oaks and Nealon, have City-provided waste bags; Willow Oaks also has a water source for dogs.
Enough bike racks, well placed
Citywide: all parks · Citywide guideline
Look for more picnic areas
Citywide: all parks · Citywide guideline
Picnic tables were added at Burgess and Willow Oaks (2024).
2019 plan wording, p. 138 · City record, Oct. 22, 2025 (F-3.2)
Check every project for green infrastructure
Citywide: all parks · Citywide guideline
The City's green stormwater plan is one of the plans used to rank capital projects.
2019 plan wording, p. 138 · City record, May 12, 2026 (G-2.2)
Zero waste infrastructure and materials
Citywide: all parks · Citywide guideline
29 fountains became bottle-filling stations (2021). Zero waste materials are not documented.
2019 plan wording, p. 138 · City record, May 25, 2021 (O-2.76)
Shade at play, picnic and seating areas
Citywide: all parks · Citywide guideline
Shade structures were added to the Kelly Park project (CPP020), with $500,000 for FY 2026-27. No citywide shade program.
2019 plan wording, p. 138 · City record, June 9, 2026 (G-2.4)
Improve habitat in parks
Citywide: all parks · Citywide guideline
Restrooms in all parks where feasible
Citywide: all parks · Citywide guideline
EV chargers where parks have parking
Citywide: all parks · Citywide guideline
Solar carports and EV chargers in the Kelly Park lot (CPB024). Completion not yet published.
2019 plan wording, p. 138 · City record, April 14, 2026 (L-2.6)
Trash enclosures
Citywide: all parks · Citywide guideline
A Dumbarton Rail Corridor trail and crossing to the Belle Haven campus
Belle Haven Community Campus, Kelly Park, Citywide: access and connections · Capital project · $$$$: $2,000,000 or more
SamTrans is studying the corridor with walking and biking links. No City capital project funds it.
2019 plan wording, p. 140 · City record, Feb. 11, 2026 (E-2.5; E-2.13)
A Middle Avenue undercrossing of the Caltrain tracks
Citywide: access and connections · Capital project · $$$$: $2,000,000 or more
At 35% design. Staff put the construction funding gap at $34-43 million (May 2026).
2019 plan wording, p. 140 · City record, May 12, 2026 (G-2.3; G-2.22)
Improve the landings of the Highway 101 overcrossing
Kelly Park, Citywide: access and connections · Capital project · $$$: $500,000 to $2,000,000
Extend the trail and linear park along the Caltrain line
Citywide: access and connections · Capital project · $$$$: $2,000,000 or more
A walking and biking trail along Ivy Drive, on SFPUC land
Citywide: access and connections · Capital project · $$$: $500,000 to $2,000,000
In 2021 staff found SFPUC rules do not allow bike paths on the Ivy Drive medians.
2019 plan wording, p. 140 · City record, Sept. 14, 2021 (M-1.7)
Creek access points and overlooks, with the creek authority
Citywide: access and connections · Capital project · $$$$: $2,000,000 or more
Trees and landscaping in El Camino Real and downtown open space
Citywide: access and connections · Program or practice
Carried out through the Downtown Streetscape project (CPS004).
2019 plan wording, p. 140 · City record, April 14, 2026 (L-2.12)